Fix The DistrictWimbledon branch

What happened

On Thursday 15 October we held our second demonstration, outside Southfields station, and the space was packed. People of all ages and from all walks of life came: commuters on their way home, families, neighbours, and plenty of people at their first ever demonstration.

Thank you to everyone who came and made it such a friendly, collaborative evening. More than 200 people joined our mailing list that evening, and our local MP and councillors came to support us too.

As if on cue, the line developed a fault while we were standing there: TfL’s own status reported a track fault at Southfields, with minor delays between Earl’s Court and Wimbledon.

Nobody blocked anything. The station entrances stayed clear the whole time, and station staff and the British Transport Police knew we were coming.

First, TfL needs to study the options for fixing the branch, with Network Rail. Then the Government needs to pay for it. That’s what we’re asking for.

In the press

All our press coverage, from BBC London to the local papers →

The evening, in photographs

A crowd of campaigners outside Southfields station at sunset, holding placards including “Late again? It’s not you. It’s the signalling.”, “£0 funded to fix the branch.” and “Had to get a cab.”
The group photograph outside Southfields station.

Photographs by the campaign, free to reuse with credit to Fix The District.

Press pack

Media advisory, key facts and downloads

For journalists and editors. Spokespeople: Max Barber and Susan Cusack. Please contact us at campaign@fixthedistrict.org.

Media advisory

What
A peaceful commuter demonstration calling on the Government to fund modern signalling on the District line's Wimbledon branch.
When
Thursday 15 October 2026, 5pm to 7pm. Busiest 5pm to 6:30pm.
Where
Outside Southfields station, Wimbledon Park Road, London SW18 5RJ — public pavement.
Who
Fix The District, a volunteer campaign of District line passengers on the Wimbledon branch, with local residents and commuters. Spokespeople: Max Barber and Susan Cusack.
Why
The branch was dropped from Four Lines Modernisation in 2020 and has no funded replacement. Passengers have logged delays since February 2026 alongside TfL's own live status.
Photo opportunity
Group photograph at 6pm, with the campaign banner and station signage in frame. Testimony placards carry verbatim passenger reports. Vertical clips welcome.
Contact
campaign@fixthedistrict.org

About the campaign

Fix The District is a community campaign by District line passengers on the Wimbledon branch. Since February 2026 passengers have logged delays at fixthedistrict.org, and each report is recorded alongside TfL's live status at the time. The campaign uses that evidence, plus TfL and Network Rail Freedom of Information data, to ask Government to fund modern signalling on the branch, which was dropped from Four Lines Modernisation in 2020 with no funded replacement. A petition is open, addressed to TfL, the Mayor of London and the Secretary of State for Transport.

Key facts, with sources

  • “…the western branches of the District line will not be re-signalled… We will continue to assess whether we can convert this signalling in the future.”

    TfL Programmes & Investment Committee, Investment Programme Report Q2 2020/21, 11 December 2020; repeated verbatim on 21 July 2021. Agenda and papers (PDF) →

  • “The 4LM project is replacing the signalling system as far as East Putney station.”

    TfL, FOI-4657-2526, 7 April 2026. TfL's response →

  • Network Rail holds “no funding decisions, budget allocations, or timeline documents for any signalling replacement” for the branch.

    Putney News, 2 May 2026. Read the report →

  • The £500,000 package announced before the 2026 Championships failed three times inside a fortnight.

    Putney News, 12 July 2026. Read the report →

  • South Western Railway's operator transferred into public ownership on 25 May 2025.

    Department for Transport. Announcement →

  • East Putney, Southfields, Wimbledon Park and Wimbledon together see 29.3 million station entries and exits a year.

    TfL, Usage Statistics for London Stations 2025. Wimbledon's figure includes National Rail and tram.

Filming note: please ask before close-up shots of identifiable commuters.

Downloads

Photographs from the evening are further up this page. Photographs from the first demonstration are on its page.

Spread the word

Most people who use this branch every day still don't know it was left out of the upgrade. Send this to a fellow passenger.

Stay in touch

Our demonstrations: Wimbledon, 17 September · Southfields, 15 October · East Putney, 3 December (next)

Questions, or from the press? campaign@fixthedistrict.org